We are currently updating our website. Please check back regularly for updates.

Submit your details for a FREE callback       

Tel: 01323 765365 | Mail: info@eastnorltd.co.uk


Electrical and Mechanical projects

  • Fire escape - Eastbourne Hotel

    January 2012

    The steel fire escape was a direct replacement. Fabricated at our works and then installed at the rear of a leading Eastbourne hotel. The structure was galvanised then installed to fit within a time scale created by the customer and ourselves to produce a safe and uncomplicated installation.

     

     

  • Power Distribution

    July 2012

    The power was supplied from an existing Bus Bars system fed from a 630A Fuse Switch, then distributed via a Loadbank & Fuse Boards to the final circuits (including all cable management).

 

 

  • Hand Rails - East Sussex Council

    October 2012

    The hand rails and staircase were made from stainless steel and fabricated at our works then installed at the offices of East Sussex Council.

 

 

  • Conveyoring

    November 2012

    This conveyor wiring was installed working closely with a conveyor design specialist. Including 400v & 24v Drives, E stops, photocells, solenoids and integration into existing control systems.